Date for the reopening of Chiswick Rail Station footbridge confirmed
Pedestrian footbridge at Chiswick Station before work started at the beginning of August
Footbridge reopened after six months of repair work
Network Rail has confirmed the date for the reopening of the passenger footbridge over the railway lines at Chiswick Station.
The bridge will be reopened on Friday 27 February, with the Mayor of Hounslow, Chiswick Riverside Councillor Amy Croft there to declare it officially open.
READ ALSO: Pedestrian bridge at Chiswick Station back in place
The bridge has been out of use since last August, when Network Rail started repairs on it. They found out on detailed inspection that its condition was a lot worse than they had anticipated and announced they would have to take it off site and the closure would be a lot longer than the original two months advertised.
Footbridge being removed in December; photograph Grove Park Group
People spotted jumping down onto the tracks to cross instead of making a detour round the road bridge
There was much grumbling from local councillors, and concerns raised when passengers, including children, were spotted jumping down on to the tracks to cross instead of going the long way round by the road bridge.
READ ALSO: Major engineering work completed on Barnes Railway Bridge
READ ALSO: Chiswick Station footbridge now not due to reopen until February 2026
READ ALSO: Children caught on camera crossing the railway line at Chiswick Station while footbridge closed
When they lifted the span back into place a couple of weeks ago, a Network Rail spokesperson said:
“We would like to thank the Chiswick community for their patience while we have been carrying out these essential repairs.”
When the bridge is reopened on Friday, we will have to find something else to grumble about.
Span in mid air as it was manouevred back into place; Photograph Michele Kalish
Read more stories on The Chiswick Calendar

Support The Chiswick Calendar
