Pedestrian bridge at Chiswick Station back in place
The span of the pedestrian bridge over the railway at Chiswick Station back in place; Photograph Michele Kalish
Pictures by Michele Kalish
The span of the pedestrian footbridge over the railway lines at Chiswick Station was lifted back into place on Sunday (8 February).
The footbridge has been out of action since the beginning of August last year and the span was taken away for repair off site after Network Rail found it needed more work than they had anticipated.
READ ALSO: Children caught on camera crossing the railway line at Chiswick Station while footbridge closed
READ ALSO:Major engineering work completed on Barnes Railway Bridge
It should be back in use by the end of this month, the railway operator says.
View from the end of Park Road as the crane lifts the span into position; Photograph Michele Kalish
Span in mid air as it is manouevred into place; Photograph Michele Kalish
The footbridge last summer, before work started on its repair; Photograph Bridget Osborne
Read more stories on The Chiswick Calendar

Support The Chiswick Calendar
